Moreno del Valle Arquitectos, SLP | Railway Control Center
Metal-fa%C3%A7ade-detail-640x426.jpg
The building is categorical on its implantation, an auxiliary plot nearby the albacete station railways. The proposal gets presence without stridencies, with discretion.
General-view-640x338.jpg
 
Control-Screens-640x306.jpg
The building has to solve a multiuse program, it also has to be a very symbolical landmark. This independent volume integration has allowed its distribution on the plot, in relation with its nearest surroundings; the highest block is situated in front of the railways, and now it’s been a referent from every point of view. the rest of the blocks, lower from the first, establish a relation with the rest of the technical buildings and help to reorder the area.
Ligth-difuse-Ligth-through-the-offices-640x276.jpg
 
Main-Entrance-from-the-interior-640x288.jpg
 
General-nigth-view-640x426.jpg
The plans show the specific interactions between the modules that compose the building. There are technological reasons for the measurement and distribution of every single space and the relation among them is not casual responding to an implicit order. The materials are used to emphasize the character of the modules. Vertical ridges texture the concrete walls of the lower blocks and the perforated and stamped steel is reserved for the higher part, light in both senses.
General-View-from-the-south-640x480.jpg
 
Aerial-View-of-the-building-640x480.jpg
Structurally had to find a solution able to cover a span over 25m long as well as make a plane bearing roof slab for the machinery. A isostatic prefab-prestressed concrete structure was elected, with rectangular pillars and omega section framework-beams. The railway control operators activity is 24h long, and is because of this that the main space must be designed with the best ergonomic, climate and lightning conditions. To achieve it the control room has a double height and all the offices look at the screens with no restrictions in the ground floor and the mezzanine, and also a very accurate lighting system and a precise air conditioning system were deployed.
Night-close-up-640x480.jpg
 

The building is a new standard and benchmark to this type of building worldwide, in line with the Spanish high speed railway.
Location: Albacete, Spain Architect: Moreno del Valle Arquitectos, SLP | David Moreno del Valle Client: Adif
Situation: Railways station
Collaborators: Daniel Vazquez Míguez, arquitecto, Borja Martin Melchor, arquitecto, Antonio Pascual Ciudad, iccp, Jose Zamora Garcia, Aisin simarro Levia
Quantity surveyor: Mariano Oviedo Oviedo
Engineers: Javier Ruiz López, Jorge Alvarez Garcia, Francisco Garcia Fernandez, Carlos Díaz Palacios
Photography: Fernando Alda
Construction company: Thales
Built surface: 2.031,13m2
Awards:  Selected project in the XI Bienal de Arquitectura Espa?ola
.....提示:网站下载资源都有备份,如遇到下载地址失效请及时联系管理员(QQ:3459039404)恢复下载地址(个别无法恢复会退币)
您需要登录后才可以回帖 登录 | 立即注册

本版积分规则

室内设计工具箱

QQ|手机版|Archiver|室内人 ( 辽ICP备05022379号 )

GMT+8, 2025-6-22 10:44

Powered by Discuz! X3.5关于室内人 | QQ:3459039404(客服) | Email:snren_com@163.com

© 2001-2025 Discuz! Team.

快速回复 返回顶部 返回列表