East Oakland Sports Center \ ELS Architecture and Urban Design
To build a new sports center in Oakland's Ira Jinkins Park and make fitness and recreation accessible to the low-income Brookfield neighborhood has been the city's dream for more than 20 years. After San Francisco's 2012 Olympics bid failed in 2002 and dashed plans to build an Olympic training center on the site, the city collaborated with ELS Architecture and Urban Design to make the project feasible anyway, refining the program, seeking new funding sources, and breaking the project into two phases to build the core components first.
The first phase opened in June 2011, a state-of-the-art 25,000-square-foot community sports, recreation, and aquatics center. It includes a natatorium with an indoor leisure pool, a dance and aerobics studio, a fitness center, locker rooms, and a lobby. A learning/media center helps improve student academic success while also providing space for senior gatherings and community meetings. Future phases will add soccer and baseball fields as well as a two-court gymnasium with a suspended running track and a 25 yd x 25 m competition pool to replace the site's existing Brookfield/Ira Jinkins Recreation Center.
Project credits / data
Architect: ELS Architecture and Urban Design
Project Team: Clarence D. Mamuyac, Jr., AIA, LEED? AP, NCARB
Principal in Charge: Christopher Jung, LEED? AP, Project Designer and Manager
Design and Production Team:
William Gordon, LEED? AP
Sims Key
Gerald Navarro
Rick Wang
Location: Oakland, California
Client: City of Oakland
Date of occupancy: July 1, 2011
Gross square footage: 25,000 Phase I (50,000 sf total when Phase II is completed)
Site area: 11 acre site
Construction: cost $20 M
Contractor: Turner Construction
Consultants:
Telamon Engineering Consultants, Inc., Civil Engineers
SOHA Engineers, Structural Engineers
F.W. Associates Inc., Electrical Engineers
H&M Mechanical Group, Mechanical Engineers
Aquatic Design Group, Aquatics Consultants
Keller Mitchell & Co., Landscape Architects
Michael Heacock Architects, LEED Consultant
Rick Unvarsky Consulting Services, Inc., LEED Commissioning Agent
Timmons Design Group, Shading and Thermal Comfort Analysis
Farber Energy Design, Title 24 Analysis
Key materials (type/brand):
Metal Sidings – Centria
Glass – Oldcastle Glass
Polished Cement Masonry Units – Trenwyth Industries
Curtainwall and Storefront systems – Kawneer North America
Sports Flooring – Connor Sports Flooring, Mondo U.S.A. Wood Ceilings – Rulon International
Software used: Revit, Autocad
Awards/certifications: LEED? Silver
Photographer: David Wakely |
|